Monday, June 10, 2019

BIM (BUILDING Information Modeling ) Essay Example | Topics and Well Written Essays - 1500 words - 1

BIM (BUILDING Information Modeling ) - Essay ExampleThe lifecycle of a harvest-feast involves introductioning, building, operation, and maintenance activities. Since current buildings rely upon drawings, building designs have formerly focused upon communications through numerous distinct and often inconsistent documents. With BIM, building designs are not just about drawings and numerous documents, but about a data repository where structure and continuation information is combined in whiz expedient model for sharing amongst all stakeholders (McNell et al, 5). As a model-based design process, BIM offers explicit design information, for instant consideration and evaluation of the design objective and program. As a result, BIM model offers augmented process competence and superior quality accuracy compared to conventional 2D CAD drawings. 2.0. Management of BIM Previously, interior designers designed buildings which were then scrutinized by applied scientists who offered feedback and technical responses concerning the design (AUGI, 1). Conversely, the contractors obtained the drawings and build the structure. At this point, every party played their own part. However, BIM and all its inventions, ideas, methods and designs are all owned by the Department of design and Construction. According to AUGI, the other persons using BIM like contractors only have temporary use for given time extents after which all BIM copies are submitted to DDC. In the BIM model, the owner hires an architect and contractor. The architect is the design review agency while the contractor performs QC testing and inspection (Ashcraft and Shelden, 7). The architect works with specialist consultants and points (A+E). The contractor works with engineer contractors and subcontractors. The subcontractors work as product suppliers, material suppliers, installers and labor unions among others. The contractor have a construction simulation model and fabrication model, the architects have the d esign model, and the engineer will have the analysis model depending on their discipline (Ashcraft and Shelden, 7). BIM collaborative use requires that all available models are interoperable and that each model is a clear and consistent representation of the same structure. 3.0. BIM practice The building industry comprises of architects, engineers, contractors and owners or (A/E/C/O). The architect is provided with a service request (Ashcraft and Shelden, 7). The architect is responsible for designing buildings and space using BIM and has the intentions to have the building executed to work. However, the role of the architects expanded to business strategy, and technology among others. The professional engineers then utilize youthful 3D modeling and visualization (Revit and AutoCAD) for 3D design. After receiving the request, the architect validates and designs the structure. Conversely, the engineer imports conventional 2D drawings that have 3D information for precise establishmen t of 3D renderings. When coupled with onsite coordination, 3D visualization offers improved accuracy for detection and resolution of instances of collision among infrastructure components. The process used here is crash detection (Ashcraft and Shelden, 7) and is live saving since component collisions are only detected after commencement of construction. The engineer then documents the findings and issues to the designer. The designers utilize BIM to discover substitute concepts, perform value engineering science and optimize designs. Given the BIM model, t

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.